homeAbout UsTesting
 

Testing

B 6_6B 11_1ROV601-2-1ZKZ DL 0032Heraeus
  • 100 % functional inspection – Acceptance Production Testing, development testing
  • products and subassemblies functional testing
  • long-endurance tests in automated 24/7 cycle
  • high/low temperature & barochamber tests
  • testing in simulated closed control loop